How do I prorate CapEx over the duration of a job?
To distribute capital expenses incurred over a period of time rather than at the beginning of a job (facility construction, well drilling etc.) you can define it by means of a table in the Activities Pane of the Facility Construction job or the Well Drilling Info Tab, or any other job type that includes a Duration input.